Standard Electricity Load Calculation Engine

Electricity Load & Demand Calculator

Accurately evaluate your home, shop, or commercial electric load schedule. Designed for new service connection (NSC), load enhancement, single vs 3-phase distribution, and energy planning.

Standard DISCOM Appliance Norms Connected Wattage & kW Calculation Single-Phase vs Three-Phase Guidance Exportable Load Sanction Schedule

Appliance Connected Load Schedule

Quick Templates:
Standard: Electricity Supply Code Norms
Appliances (विद्युत उपकरण) (a) Load (Watts) (b) Quantity Total (Watts)
Total Connected Load (कुल कनेक्टेड लोड / विद्युत भार): 0 W
Add Additional / Custom Appliance:

DISCOM Electricity Load Sanction Guidelines

According to State Electricity Regulatory Commission (SERC) Supply Codes and DISCOM operational standards:

Single-Phase (1-Phase) Supply

Permitted for connected load up to 5 kW (or 7.5 kW in specific urban areas). Suitable for 1 BHK & standard 2 BHK homes with normal household appliances.

Three-Phase (3-Phase) Supply

Mandatory for connected load above 5 kW. Essential when operating multiple Air Conditioners, EV chargers, 3-phase pump motors, or heavy commercial equipment to balance distribution load.

Connected Load vs Sanctioned Load

Connected Load: Total sum of all installed appliances.
Sanctioned Load (kW): The maximum allowed demand allocated by the electricity board based on diversity factor.

Why Accurate Declaration Matters

Under-declaring load can trigger maximum demand penalty charges on digital smart meters, voltage drops, or MCB trippings. Maintaining proper sanctioned load ensures safety and uninterrupted power.

⚠️ Regulatory & Informational Notice

This calculation tool helps consumers estimate total connected wattage and recommended sanctioned load according to standard electricity supply codes. Actual sanctioned load approval remains subject to local DISCOM site verification and testing.

Assessment Summary LIVE
Total Connected Load
0.00
kW
0 Watts total load
Recommended Connection Single-Phase
1
kW Sanctioned
Load ≤ 5 kW: Standard Single-Phase connection is suitable.
Daily Usage Projection: 4 hrs/day
Est. Monthly Consumption: 0 kWh (Units)
Open UP / Bill Calculator

Load Distribution by Appliance Type